Mayline
  • Products
  • About Us
  • Track Your Order
  • Home
 
Dealer Resources
Order
Information
  • Inventory Availability
  • Track Your Order
  • Outlet Store
  • Dealer Close-Outs
  • Product Lead Times
  • Corporate Color Program
  • GSA
  • Online Order Entry
  • Freight Policies
  • Warranty
Marketing
Materials
  • My Account
  • Order Literature
  • Order Finish Samples
  • Current Price List
  • Selling Tools
  • Brochure Downloads
  • Photo Gallery
  • GREENGUARD Certified Products
  • Success Stories
  • Dealer Bulletins
Programs &
Services
  • Assembly Instructions
  • Assembly Times
  • FREE Spaceplanning & Quoting Service
  • Kwik Ship
  • Certified Installers
  • Fast Freight
  • Sales Rewards & Promotions
  • Sustainability
  • Employment Opportunities
  • FAQs
Find A Dealer Contact Us
High Density Filing

Design Services Resources

  • CSII
  • Mailroom
  • High Density Storage Systems
  • High Density Storage Systems Online
  • LAN Furniture
  • TechWorks
  • TransAction

LAN Center Design

Use this worksheet to specify a Maytrix™ LAN Center that allows you to organize your LAN system hardware into a single, space-saving location. Using the "building block" components of the Maytrix Racking System for computer hardware, it's easy to maximize the use of valuable floor space. Best of all, the system is expandable to accommodate future changes in the number or size of monitors, CPUs, and other peripherals.

How Much Space is Available:


Dimensions of Available area:

Desired Length: Width: Height:
Is this space against a wall or divider? Yes No
If no, do you want to mount equipment on both sides of your LAN station? Yes No
Will this require a corner configuration? Yes No

 

Needed Features:


Does the LAN center need to be mobile? Yes No
Mobile CPU shelf? Yes No
Does the LAN rack need to bolt to a wall? Yes No
Will a worksurface be needed? Yes No

Worksurface width:

other

Worksurface depth:

other
What worksurface finish do you require?
If yes, can monitors be on worksurfaces? Yes No
Peninsula table needed? Yes No
Is storage required? Yes No
Type: Overhead Files Keyboard
Is a locking enclosure required? (13"H x 13"D standard) Yes No
Cable management? Yes No
Power Strip? Yes No
Surge Protection? Yes No
Is seating needed? Yes No

 

Equipment List:


Monitors: Up to 15" Diagonal qty. Printers: Dot Matrix qty.
17" to 19" Diagonal qty. Laser qty.
20" and Higher qty. Other: External Modem qty.
CPUs: Desktop qty. External CD-ROM qty.
Mini-Tower qty. External Drive qty.
Tower qty. External Tape qty.
Double Wide qty. UPS qty.
Input Devices: Keyboards qty. 19" Rack Mount qty.
Mice qty.    
Please list any equipment specs if applicable (Monitors, Computers, test Equipment, Etc.:)

Other Details:


Are there any other special requirements that should be known prior to designing your LAN center?

 

When complete, submit this form to Mayline using the button below.

*Name:
*Company/Organization:
Job Title
Industry
*Address 1:
Address 2:
*City:
*State:
*Zip:
*Telephone:
Are you a (an): Dealer End User
If a dealer, please indicate the end user for this project:
When is your intended installation date?
Please indicate how you would like to receive your quote and drawing.
Fax *Fax or E-Mail:
E-Mail

Items marked with an asterisk * are required.

  • Home
  • Dealer Resources
  • Find A Dealer
  • Products
  • About Us
  • Track Your Order
  • Dealer Log-In
  • Contact Us
Follow us on FaceBook
619 North Commerce Street • P.O. Box 728 • Sheboygan, WI 53082-0728 • 1.800.822.8037
©2010 Mayline ® | Site Designed by BrownBoots Interactive, Inc.